WATERPROOFING OF STRUCTURES: CHALLENGES AND SOLUTIONS

Sunanda gives waterproofing solutions to the world's largest clock tower situated in UAE.

Sponsored Link Spot Available — Get This Spot Al Yaqoub Tower is a tall building in Dubai, United Arab Emirates. The tower reached its peak in 2010 and was completed in 2013.

Problem: To avoid seepage from wet areas and make structures durable.
Application: Waterproofing by crystallization.
Conclusion: We have suggested waterproofing by crystallization. It is an economical waterproofing system in the form of dry powder. When applied it becomes an integral part of concrete, so cannot puncture or tear. The system is durable and lasts as long as the concrete.


Location: Sheikh Zayed Road, Dubai, UAE
Client : Al Yaquob Group
Material consultant - Sunanda Speciality Coatings Pvt Ltd.
Email - [email protected]
Website - www.sunandaglobal.com
Contact Email
[email protected]
Issued By
Sunanda Global
Phone
09372505357
Business Address
SUNSHINE TOWER 36TH FLR S B MARG, PRABHADEVI, PRAB, PRABHADEVI
PRABHADEVI
Country
India
Categories
Technology · Tourism · Travel
Last Updated
April 24, 2021

Disclaimer: This press release was submitted by a registered PRFree contributor and has not been verified or endorsed by PRFree. PRFree assumes no responsibility or liability for its accuracy, content, legality, or reliability. The contact email for this release can be viewed here. See our Disclaimer.

Delete Press Release · Edit Press Release