WATERPROOFING OF STRUCTURES: CHALLENGES AND SOLUTIONS
Sunanda gives waterproofing solutions to the world's largest clock tower situated in UAE.
Al Yaqoub Tower is a tall building in Dubai, United Arab Emirates. The tower reached its peak in 2010 and was completed in 2013.
Problem: To avoid seepage from wet areas and make structures durable.
Application: Waterproofing by crystallization.
Conclusion: We have suggested waterproofing by crystallization. It is an economical waterproofing system in the form of dry powder. When applied it becomes an integral part of concrete, so cannot puncture or tear. The system is durable and lasts as long as the concrete.
Location: Sheikh Zayed Road, Dubai, UAE
Client : Al Yaquob Group
Material consultant - Sunanda Speciality Coatings Pvt Ltd.
Email - [email protected]
Website - www.sunandaglobal.com
Problem: To avoid seepage from wet areas and make structures durable.
Application: Waterproofing by crystallization.
Conclusion: We have suggested waterproofing by crystallization. It is an economical waterproofing system in the form of dry powder. When applied it becomes an integral part of concrete, so cannot puncture or tear. The system is durable and lasts as long as the concrete.
Location: Sheikh Zayed Road, Dubai, UAE
Client : Al Yaquob Group
Material consultant - Sunanda Speciality Coatings Pvt Ltd.
Email - [email protected]
Website - www.sunandaglobal.com
- Contact Email
- [email protected]
- Issued By
- Sunanda Global
- Phone
- 09372505357
- Business Address
- SUNSHINE TOWER 36TH FLR S B MARG, PRABHADEVI, PRAB, PRABHADEVI
PRABHADEVI - Country
- India
- Categories
- Technology · Tourism · Travel
- Last Updated
- April 24, 2021