Claims involving tetrachloroethylene, commonly known as perchloroethylene or PCE, can raise complex questions about contamination sources, groundwater movement, sewer infrastructure, and potential property impacts. Bonneau Dickson, PE, a licensed sanitary engineer with more than 25 years of forensic engineering and expert witness experience, provides engineering consulting related to PCE contamination claims, including investigations involving dry-cleaning operations, underground utilities, wastewater systems, and water resources.PCE is a chemical solvent historically used in several commercial and industrial applications, particularly dry-cleaning operations. Because of its potential to affect soil and groundwater, its presence at a property can lead to technical investigations and legal disputes. These matters may involve questions about where the chemical originated, how it moved through the environment, whether underground infrastructure contributed to its migration, and what conditions may have affected nearby properties or water supplies.
Resolving these questions requires an examination of site history, environmental information, engineering records, and the physical characteristics of the affected infrastructure. Engineering analysis can help clarify how water systems, sewer lines, and other underground structures may relate to the movement or detection of PCE.
Understanding the Engineering Issues in PCE Claims
PCE contamination cases can involve multiple properties, businesses, and underground systems. A former dry-cleaning facility, for instance, may be identified as a potential source of contamination. However, determining whether a particular operation caused contamination at another location requires more than establishing that PCE was used at the site.
Investigators may need to examine the history of chemical handling, storage, disposal practices, property use, and past site conditions. They may also review environmental sampling results, groundwater information, utility plans, and records of sewer construction or repair.
The location and condition of underground infrastructure can be especially relevant. Sewer pipes, service connections, and other buried utilities may intersect areas where contaminated soil or groundwater is present. Their design, construction, condition, and relationship to surrounding materials can become important subjects during an engineering investigation.
Each claim has its own circumstances. The available evidence must be evaluated to determine which potential contamination pathways are technically consistent with the site conditions.
Examining Potential Sources of PCE Contamination
Identifying a potential source is often one of the central issues in a PCE dispute. Historical dry-cleaning operations may be reviewed because PCE was commonly used as a cleaning solvent. Investigations may examine how the chemical was stored, transferred, used, and handled during the property's operating history.
Relevant records can include business permits, property ownership documents, historical site plans, equipment information, waste disposal records, inspection reports, and previous environmental investigations. These materials may help establish how a property was used and whether activities involving PCE occurred there.
However, the presence of a former dry-cleaning business does not automatically establish the source or extent of contamination. Other historical operations, nearby properties, and changes in land use may also need consideration.
A careful review should distinguish documented facts from assumptions. It should also consider whether the timing of reported chemical use is consistent with the sampling results and the conditions identified during later investigations.
Evaluating Groundwater Movement and Contamination Pathways
Groundwater conditions can influence how PCE moves beneath the ground. The direction and rate of groundwater movement may depend on factors such as soil composition, geological layers, groundwater levels, and the location of wells or other underground structures.
A contamination investigation may review groundwater monitoring data, boring logs, site elevations, geological information, and sampling locations. These records can help establish the physical conditions beneath a property and assess whether a proposed migration pathway is plausible.
Groundwater flow should not be assumed to follow property boundaries. Contamination may move across multiple parcels depending on subsurface conditions. As a result, disputes can involve properties that are not directly connected to the original site where a chemical was used.
The timing of sampling is also important. Groundwater conditions can change, and results collected at different locations or during different periods may not provide a complete picture when considered separately. A sound technical review considers the available data together with the site's physical and historical conditions.
The Relationship Between PCE and Sewer Infrastructure
Underground sewer systems can be an important part of certain PCE investigations. Sanitary sewers may pass through areas where contaminated soil or groundwater exists. Depending on pipe condition and surrounding conditions, defects or openings may become relevant to an assessment of possible contamination movement.
Potential issues include cracked pipes, separated joints, deteriorated materials, leaking connections, and damaged sewer sections. Investigators may examine whether these conditions existed, when they developed, and how they relate to the reported contamination.
Sewer construction and maintenance records can provide useful information about the infrastructure. Original plans, inspection reports, repair documents, pipe replacement records, and closed-circuit television inspection results may help establish the condition and location of sewer lines.
The investigation may also consider whether a sewer line could have provided a pathway for chemical movement or whether contamination may have affected the pipe from surrounding soil or groundwater. These are different technical questions and should not be treated as interchangeable.
The physical evidence, pipe characteristics, and surrounding environmental conditions must be considered before drawing conclusions about the role of sewer infrastructure.
Reviewing Environmental and Engineering Evidence
PCE claims often involve several categories of technical evidence. Environmental reports may document chemical concentrations, sampling locations, groundwater conditions, and laboratory findings. Engineering records may describe the layout, condition, and operation of water and wastewater infrastructure.
A detailed review may include:
● Historical property records and information about past commercial operations.
● Groundwater monitoring results and environmental sampling reports.
● Sewer maps, construction drawings, and utility connection records.
● Pipe inspection reports and documentation of repairs or replacements.
● Site plans, grading information, and available geological data.
● Records of water supply systems, wells, and nearby infrastructure.
The purpose of reviewing these materials is to understand how the different parts of the site relate to one another. For example, a groundwater sample may show the presence of PCE at a particular location, but additional information may be necessary to evaluate the possible source and migration route.
Differences in sampling dates, locations, methods, and site conditions can also affect how results are interpreted. Technical conclusions should reflect the limits of the available evidence rather than relying on a single report or isolated measurement.
Investigating Water Supply and Property Concerns
Some PCE disputes involve concerns about nearby water supplies, wells, or other property resources. These cases may require an examination of water system layouts, well locations, groundwater conditions, and potential connections between contaminated areas and water sources.
An engineering investigation may review well construction information, water supply records, sampling results, and the location of underground utilities. It may also consider whether the identified groundwater conditions are consistent with the reported concerns.
Property-related claims can involve questions about the extent of contamination, the condition of underground infrastructure, and whether particular system components were affected. Establishing these details requires a careful connection between site observations, engineering records, and environmental findings.
The Role of an Engineering Expert Witness
PCE litigation can involve disagreements among property owners, businesses, environmental professionals, utilities, insurers, and other parties. An engineering expert witness may be asked to review technical reports, assess infrastructure conditions, evaluate proposed contamination pathways, and explain engineering findings relevant to the dispute.
The work may include examining sewer systems, reviewing water and wastewater infrastructure, evaluating site records, and preparing written technical opinions. Depending on the legal matter, the process may also involve responding to questions during depositions or presenting engineering findings in court.
A forensic engineering report should identify the records and physical evidence considered, explain the methods used, and provide a clear basis for its conclusions. It should also distinguish between established conditions, possible explanations, and matters that cannot be determined from the available information.
Engineering analysis does not independently determine legal liability. Instead, it provides technical context that can help legal professionals and decision-makers understand the infrastructure and environmental conditions involved in a PCE claim.
About Bonneau Dickson, PE
Bonneau Dickson, PE, works independently on sanitary and forensic engineering matters involving public and private infrastructure. His project background spans wastewater treatment facilities, sewer networks, water distribution systems, pump stations, and contamination investigations. His professional work also includes engineering evaluations, field investigations, technical reporting, depositions, and expert testimony in disputes involving water, wastewater, and stormwater systems.
Media Contact:
Bonneau Dickson, PE
2428 McGee Avenue, Suite 2
Berkeley, CA 94703
(510) 845-8625
Email: [email protected]
Website: https://bonneaudickson.com/