Sponsored Link Spot Available — Get This Spot The work was carried out for Learning Academies Trust (LAT) during the 2026 summer holidays and was completed before pupils returned to school.
Rhino Play removed all of the old timber equipment from the Years 1 and 2 playground but left the non-rotting rubber stepping posts and wet pour rubber surfacing in place. Rather than disposing of them, the team designed the new trail to work around them, cutting waste as well as cost. Patch repairs were made to the wet pour surfacing so the project could still go ahead on a restricted budget.
The school was offered the choice of Rhino Play's Redwood laminated timber or its brown recycled plastic, and chose timber because of its tight budget. Replacing the old equipment rather than repairing it was a deliberate choice, as ongoing repairs tend to cost more in the long run.
The new trail mixes up the equipment along its length, with traversing trees, a trapeze swing with attached pull up bars, a canyon bridge and a canyon crossing. It is designed for the age range and abilities of Years 1 and 2, offering plenty of physical challenges to help children improve their balance, co-ordination and core strength during play and PE. The scheme was also designed so that wheelchair users can still interact with it, even if they cannot access it.
Rhino Play handled the whole project, from design and manufacture through to installation.

Stuart Hunt, Head of Sales at Rhino Play, said:
"Shakespeare is a good example of how a school can get a brand new trim trail without starting completely from scratch. The rubber stepping posts don't rot and the wet pour surfacing could be patch repaired, so it made sense to keep them and design the new trail around them. That kept waste down, saved money and meant the school could go ahead with the project on a tight budget.
"Giving the school the choice between timber and recycled plastic was important too. Every school's budget is different, and we want to offer options that work for them. We were pleased to get everything finished over the summer holidays, so the children came back to a new trail ready to use."
More details and photos of the project are available in the Shakespeare Primary case study: https://rhinoplay.co.uk/case-studies/timber-trim-trail-replacement-shakespeare-school-plymouth-september-2026/

About Rhino Play
Rhino Play designs and installs playgrounds, outdoor learning environments, trim trails, fitness equipment, surfacing, seating areas and bespoke outdoor play equipment for schools, parish and local councils, and community and commercial organisations. Rhino Play works with schools, councils and organisations across England and Wales, with free, no-obligation site visits.